Commercial Construction in Austin, TX, Built Around Your Business
Restaurant and hospitality build-outs, warehouse and industrial interiors, and structural steel and metal work. A different set of problems from residential work — schedule certainty, working around an operating business, and a general contractor who doesn’t have to sub out the steel.

Commercial clients ask different questions
A homeowner wants to know what the kitchen will look like. A property manager wants to know whether you’ll finish on the date you said, whether your crew can work around a business that’s still trading, and whether your insurance limits satisfy their landlord.
So we run commercial work differently. A schedule with named milestones and a stated consequence for missing them. Night and weekend phasing where the space has to keep operating. Code and permit fluency, because a restaurant that can’t open on its date is losing more per week than the build costs.
And we carry long-standing fabrication shops who work to our drawings and our schedule rather than theirs. That’s why the storage-facility job was ours.
Three things, done properly.
Restaurant & hospitality build-outs
Kitchens, bars, dining rooms and the mechanical work behind them. Health department and fire marshal coordination, grease interceptors, hood systems and make-up air.
Restaurant build-outs →Warehouse & industrial interiors
Demising walls, mezzanines, office fit-out inside a shell, dock and door work. Scissor lifts and forklifts run by our own crew.
Warehouse & industrial →Metal fabrication & welding
Structural steel, railings, stairs, canopies, brackets and custom work, detailed with our fabricators and installed by us.
Metal fabrication →Tenant improvement is the phrase most people search for, and it usually means one of the three above. Tell us what the space is and we’ll tell you which it is.
What a commercial project costs.
Commercial work is priced off the drawings and the schedule, not off a square-foot average. A restaurant with a hood, a grease interceptor and a health inspection is a different animal from an office fit-out in the same square footage.
Send us the plan set and the date you need to open, and we will tell you whether the date is real.
Tell us about the space.
Send the address, the square footage and a drawing set if you’ve one. We’ll come and look at it, and tell you whether we’re the right contractor for it.
Or call (512) 948-9398
Commercial work, answered
Restaurant, retail, warehouse and industrial build-outs.
Can you work around an operating business?
Yes, and most of our commercial work is exactly that. Night and weekend phasing, dust and noise control, temporary partitions and a sequence built so the trading area stays usable. The schedule is written around your hours rather than ours.
We agree the phasing plan before the contract, because it changes both the price and the schedule.
How is commercial permitting different from residential?
More reviewers, more disciplines, and health department involvement on anything with a kitchen. Commercial plan review involves building, fire, health and sometimes accessibility, and each can return comments. That is why commercial timelines are quoted in months rather than weeks.
We track the submittals and the comment responses so you are not chasing a portal.
Who does the metal fabrication?
We detail it, and fabrication shops we have used for years build it to our drawings. Structural steel, railings, stair stringers, canopies and custom brackets. Holding the drawings and the schedule ourselves keeps steel off the critical path, which on a build-out is usually where the job is won or lost.
It also means a site measurement can go to fabrication the same week.