Austin Remodeling Contractor for Architects: Your Drawings, Built Right
A builder who can price your set without three weeks of RFIs, who flags the details that won’t build before they reach the field, and who doesn’t undermine you with your client.

Four things you can rely on.
Budget pricing from your set, at no charge
Send drawings at any stage and you get a line-item budget with the assumptions stated. Early enough to be useful, honest enough to be usable with your client.
Constructability flagged early
If a detail won’t build, or will build at three times what the client expects, you hear it during design rather than as an RFI in week nine. We put it to you, not to the client.
We build what you drew
Substitutions come to you for approval. We don’t value-engineer your design in a meeting you weren’t in, and we don’t tell the client a detail isn’t worth it.
Steel and metal
Steel, stairs, railings, canopies and connections are detailed with our fabricators and installed by us. Details that would be a specialist package elsewhere are a normal job here.
Your client stays your client.
The reason architects stop referring a builder is rarely the quality of the work. It’s the builder who positions himself as the sensible one and the architect as the expensive one, and who ends up holding the relationship at the end of it.
We’re a design and build firm, so we could bring our own designer to every project. On your jobs we don’t. You’re the designer, the client knows it, and we say so.
Budget pricing.
Any stage — schematic, design development, permit set. Tell us what the client's number is if you know it, and we’ll tell you whether the design is inside it.
Constructability notes, not a redesign.
When we price your drawings we send back a short list of things worth knowing. It is not a critique, and it is never an argument for a different design.
Details that will be expensive to build
Not wrong — expensive. You may well decide it is worth it. But you should know before the client does.
Long-lead items
A specified window or fixture with a sixteen-week lead time changes the schedule more than almost anything on site.
Anything the city will question
Impervious cover, the Subchapter F envelope, critical root zones. We would rather raise it at pricing than at review.
We do not send a list of substitutions with your set. If we think something should change, we say why and leave the decision where it belongs.
What architects ask us first.
Will you build exactly what is drawn?
Yes. If we think something should change, we ask — we do not decide. A set that gets quietly reinterpreted on site is how an architect stops trusting a builder, and we would rather lose an argument than do that.
Will you price a set for free?
Yes, and early is better than late. Pricing at design development is far more useful to everyone than pricing a finished set that turns out to be twenty percent over.
Who does the client hear from?
Us, on schedule and cost. You, on design. One point of contact on our side, a weekly photographed update, and no design conversation happening behind your back.
What do you carry yourselves?
Carpentry, and the steel scope end to end. Stair stringers, canopies, railings and connections, detailed with our fabricator and installed by us. Details that would be a specialist package elsewhere are ordinary work here, which usually helps a drawing survive the budget.
What do you need from us to price properly?
Dimensioned plans, elevations, and whatever specification exists. If the specification is not written yet, tell us the level you are aiming at and we will set allowances against it rather than against a guess.
Have a set you want priced?
Send it at any stage. Early is more useful than late, it costs you nothing, and we will come back with constructability notes rather than substitutions.
One office, one number. Every message is read by the people who would build your project.
Fully insured · NARI member · two years on workmanship · lifetime warranty on our shower pans



