The Stubborn Tub: A Complete Austin Bathroom Re-Plumb
A leak under a jacuzzi tub that turned into a re-plumb, new framing for the tub and the shower, and a tub that arrived damaged from the factory four times before one of them was good enough to install.

The overflow had been leaking under the tub.
The call was about a leak, not a remodel. Water was getting under the jacuzzi tub enclosure from the tub’s own overflow — the fitting near the top of the tub that is supposed to carry water to the drain when the tub gets too full. It is a slow, quiet leak, it runs inside a closed box nobody can see into, and by the time it shows itself there is usually damage.
There was. Once the tub deck and the shower came out, the framing around both was wet enough that it had to go. We replaced the framing for the tub and the shower rather than patching around the bad pieces, and re-plumbed the shower and tub water lines and drain lines while the walls were open.

Same window, same corner.
The jacuzzi tub sat on a tiled deck under the window, with a small corner shower beside it. The deck is gone, the framing behind it is new, and the room now holds a freestanding tub and a fluted white oak shower.
Drag the handle to compare.
Four tubs, four times sent back.
The freestanding tub the owners chose arrived broken or scratched from the factory four separate times. Each one went back and another was ordered.
We inspect before anything is installed
A tub gets uncrated and looked over on delivery, not on the day it is set. A scratch found in the driveway is a phone call. The same scratch found after the tile is tight around it is a demolition job.
Installing a damaged one was never on the table
It would have been the fast way to finish. It is also the thing the owners would have looked at every day for the next twenty years, so it was not an option we offered them.
You hear about it the day it happens
Four bad tubs is an irritating thing to be told four times. It is still better than finding out at the end why the room is not finished.
The finished room.
White oak slim shaker vanities with a full-height linen tower between them, a fluted white oak shower behind frameless glass, and the freestanding tub that finally turned up in one piece.




Something leaking that you cannot see?
We will open enough to find out how far it went, tell you what has to be replaced, and give you a real range before anyone pays for drawings.