Bathroom Remodeling in Georgetown, TX: Historic District to New Suburbs
The most valuable bathroom we build in Georgetown is the one that lets somebody stay in their house. Done properly, none of it looks medical — it just looks like a very good bathroom.

What a bathroom job runs into in Georgetown.
With Sun City Texas a few miles from the square, a large share of our Georgetown work is for people who have decided this is the last house. That is a specific brief and it deserves to be done well rather than done cheaply.
A properly built accessible bathroom is a full reconfiguration, not an add-on. A curbless entry means the floor is recessed and a linear drain is set into it. A bench is framed and tiled, not bolted on. Grab bars are blocked into the framing during construction so they are structural rather than screwed into tile. Doorways widen, handles become levers, and the lighting gets doubled because eyes at seventy need about three times the light of eyes at twenty.
Done that way, the room reads as a high-end bathroom that happens to be easy to use. Done the other way, it reads as a hospital, and people resent it.
Downtown, in the historic district, the project is the opposite problem: fitting a modern bathroom into a house that never had one, without damaging what makes the house worth owning.
Usual ranges in Georgetown.
Where most projects land. Not a ceiling — we build above these when the house calls for it.
Quoted on the house
Bathrooms we have finished.




Bathroom questions we get in Georgetown.
What does a bathroom remodel cost in Georgetown?
Most land between $30,000 to $130,000. That is where projects usually fall, not a ceiling — we build above it when the house calls for it, and every range is published in full on our pricing page.
Do I need a permit for a bathroom remodel in Georgetown?
For anything structural, electrical, mechanical or plumbing, yes. Permits go through City of Georgetown Development Services, with plan review published at 15 to 20 business days. We pull and track them for you as part of the job.
How long does a bathroom remodel take in Georgetown?
Three to four weeks on site with the plumbing in place, four to eight if it is reconfigured. Permitting runs before any of that, so ask for the full calendar rather than just the build window.
Do you work in Georgetown regularly?
Yes. We build across Austin and the hill country from one office, with one crew and one phone number. Tell us the address and we will say straight away whether it is in our area.
What a project in Georgetown costs.
If this is the house you intend to stay in, say so on the first call. It changes what we design, and it is the work we are proudest of.
We answer every message ourselves, the same business day during work hours.
Two years on workmanship · lifetime warranty on our shower pans · fully insured · NARI member
What clients say.
★★★★★
We hired Prime to do our bathroom and kitchen renovation. We are extremely pleased with the outcome. This was our first remodel and both my wife and I are very demanding, but Jesse was very patient and very responsive. He helped with every aspect even through warranty never shying away from any corrections or warranty issues.
Rudy Loera · Bathroom & kitchen · Google
★★★★★
Loved our remodel, they did our master bath and kitchen. They were very responsive. Actually we had a pipe break a week before we were supposed to start and they dropped everything to help me out when they didn’t have to since the remodel had not even started yet. I think that speaks volumes to the customer service that they give. I would use them again.
Brad Venghaus · Master bath & kitchen · Google