What Our Remodeling Work Costs in Austin, TX — Every Service Published
Every service, every tier, on one page — with no ceiling on any of them. These are real ranges from completed Austin and hill country projects — permitted, with drawings, and with allowances set at what the selection actually costs.
Updated September 2026

Almost nobody in Austin will tell you this before a meeting.
Ask three remodelers what a kitchen costs and you’ll get three invitations to sit down. That’s not caution, it’s a sales process — and it costs you three evenings to learn something you could have known in a minute.
We’d rather you found out now. If your budget and our range don’t meet, you’ve lost sixty seconds instead of a month, and we haven’t spent three weeks pricing a job that was never going to happen.
How to read these
Each range is a real span, not a headline figure with an asterisk. The right-hand column tells you what pushes a project to the top of its band, so you can place yourself before we ever speak.
What isn’t in them: appliances you supply yourself, furniture, HOA fees, and structural repair we find behind a finished surface — which we quote separately, the day we find it, with photographs.
On a house built before 1990, hold ten to fifteen percent back. Something turns up in roughly one project in four.
Kitchen remodeling
5–7 weeks on site
7–10 weeks on site
8–11 weeks on site
Quoted on the house
Primary bathrooms & suites
Quoted on the house
Every shower we build carries a lifetime warranty on its pan, for as long as you own the home. Bathroom remodeling → 2026 bathroom cost guide →
Adding square footage
Room · with bath · full ADU
Quoted on the site
Detached units are permitted under Austin's HOME Phase 1 rules. Austin ADU rules, 2026 →
Whole-home renovation
Systems largely intact
Plumbing, electrical, HVAC
Quoted on the house
Outdoor living
Quoted on the site
Pavers, driveways and pool decking are line items inside an outdoor living project, not standalone services.
These are the ranges most projects land in, not a ceiling. Our largest completed projects to date are a kitchen at $350,000, a primary bathroom at $170,000, an addition at about $800 a square foot, and a whole-home renovation at $1,000,000 with every finish material included. If your project is larger than anything published here, send us the drawings and we will price what is in them.
What's always included
Design support and coordination · permits pulled and tracked for you · full insurance · a dedicated project manager · a weekly update with photos · two years on workmanship.
Everything else depends on your house. Every project gets its own scope and its own quote — we'd rather price yours properly than hand you a list that fits nobody.
Most renovations at this level are financed.
We’ll introduce you to Austin lenders we have worked with, including regional banks that carry strong renovation rates. We take no fee for the introduction and we’re not paid to recommend anyone.
Bring us a number you’re comfortable with rather than the largest number you could borrow. The tiers on this page exist so you can build well inside your range instead of at the edge of it.
The whole page, not a download.
Every range we work in is on this page already — no form, no email address, no follow-up call you did not ask for. If you want the line-by-line version for your own project, the fastest route is a walkthrough: we put the numbers against your house rather than against an average one.
An hour on site, at no charge, and a real range the same day.
What people ask before they call.
Why do bids for the same project vary by $40,000?
Almost always allowances, not labor rates. A bid can look $30,000 cheaper by setting the tile allowance at $6 a square foot and the appliance allowance at $8,000. You choose real materials in month two and the number climbs to roughly where the honest bid started.
Do you take on projects larger than the ranges you publish?
Yes. We have finished a whole-home remodel at $1,000,000, with every finish material in it. We have also built a $350,000 kitchen, a $170,000 primary bathroom, and an addition at roughly $800 a square foot. The ranges on this page are where most projects land, not a ceiling — work at that level gets priced exactly the same way as everything else here, off what is actually in the drawings.
We also build commercial — restaurants, warehouse and tilt-wall — and fabricate our own steel, so large spans, engineered stairs and long trade schedules are normal work rather than something we sub out and hope for.
Are these prices fixed?
The contract price is fixed for the agreed scope. It changes for two reasons only: you change what you want, or we find something behind a finished surface. Both are quoted in writing and approved by you before any work continues.
Do you do smaller projects than these ranges?
Yes, though not many. We keep a small-projects track for work below these numbers, mostly for clients we have built for before. If that’s what you need, say so on the first call and we’ll tell you whether we’re the right firm.
How much should I hold back for surprises?
Ten to fifteen percent on a house built before 1990, five to ten on anything built after 2000. We find something behind the finishes in roughly one project in four — cast iron drain lines, undersized electrical, or water damage nobody knew about.
What do you charge for the first visit?
Nothing. We walk the space, check the structure, tell you what’s realistic in your budget, and give you a range before anyone pays for drawings.
What your house would cost.
These ranges are where most projects land. Yours gets its own quote, off a walkthrough and the drawings — not off this page.
One office, one number. We answer every message ourselves, the same business day during work hours.
NARI member · fully insured · a lifetime warranty on our shower pans, for as long as you own the home
Westlake, the hill country, and north of the river.
Each of these has its own page, because each of them builds differently.



