Explore Renovation Financing Options for Your Austin Home

Most renovations at this level are financed. We are builders, not lenders or financial advisers — the options here are the ones our clients actually use, and we say plainly where our part ends.

Long white galley kitchen with a quartz waterfall counter, Austin, TX
The common routes

Four ways people pay for this.

One

Home equity line

A HELOC draws against the equity you already have, usually at a variable rate, and you only pay interest on what you draw. The most common route for projects in the $42,500 to $250,000 range.

Suits a phased project, because you draw as you go.

Two

Home equity loan

A lump sum at a fixed rate over a fixed term. More predictable than a line of credit, less flexible if the scope changes.

Suits a fixed-scope project where the number is settled before you start.

Three

Renovation loan

Lends against what the house will be worth after the work, rather than what it’s worth now. Useful when you’re buying a house that needs a whole-home renovation and don’t yet have the equity.

More paperwork, and the lender will want the contractor's scope and schedule. We provide those.

Four

Cash, or a mix

Plenty of clients pay cash for a kitchen and borrow for an addition. There’s no prize for borrowing less or more — only for not being stretched thin when a discovery arrives.

Whatever the route, hold ten to fifteen percent back on a pre-1990 house.

What we do

We make introductions. Nothing more.

We’ll introduce you to Austin lenders we have worked with, including regional banks that carry strong renovation rates. We take no fee for the introduction and we’re not paid to recommend anyone.

We’ll also give your lender what they need from us — scope, schedule, draw structure — without you having to chase it.

We’re not licensed lenders or financial advisers, and nothing on this page is financial advice. Talk to your lender and, where the numbers are large, to your accountant.

What we’d say anyway

Borrow for the scope, not for the ceiling.

Bring us a number you’re comfortable with rather than the largest number you could borrow. The published tiers on our pricing page exist so you can build well inside your range instead of at the edge of it.

A client who’s stretched to the last dollar has no room when something turns up behind a wall — and on a house built before 1990, something turns up in roughly one project in four.

Photographs

Recent work

Wood vanity and arched green-tile shower in a remodeled bathroom, Austin, TX
Fluted walnut vanity run with brass hardware and arched mirrors, Austin, TX
Board-and-batten bathroom with a marble waterfall wall and white oak door, Austin, TX
Curbless shower in vertical wood-look tile with brass fittings, Austin, TX

See more of our work →

Common questions

Paying for a renovation, answered

We are builders, not lenders or financial advisers. This is general information, not advice.

Do you offer in-house financing?

No. We are builders, not a lender. We do not originate loans, take a commission on them, or push you toward a particular bank. What we will do is provide the scope, drawings and cost breakdown a lender asks for, and work to their draw schedule.

Anyone who tells you which loan to take should be a licensed adviser, not your contractor.

What do people usually use?

Most renovations at this level are paid for with a home equity line, a cash-out refinance, a renovation loan, or cash. Each behaves differently on a construction project — particularly in how and when money is released — and the right one depends on your rate, your equity and your tax position. That is a conversation for a lender or a financial adviser.

We are happy to be on that call to answer construction questions.

How are payments structured?

Progress payments tied to stages of work completed. Not a calendar, and not a large deposit up front. You pay for work that exists.

If your lender uses a draw schedule with inspections, we work to it and provide what the inspector needs.

Can you build the project in phases to spread the cost?

Sometimes, and we will tell you when it costs more than it saves. Phasing works when the phases are genuinely separate rooms. It works badly when it means opening the same wall twice, remobilising trades, or pulling two permits for one job.

We will map it either way at the walkthrough so you can see the difference in real numbers.

Start here

Want to know what you can build for your number?

Tell us the budget you are working with and we will tell you what it reaches. That is a more useful conversation than the other way round.

Straight to a person

(512) 948-9398

One office, one number, and a person who has been on a site this week.

Two years on workmanship, and a lifetime warranty on our shower pans · fully insured · NARI member

Call nowGet a price