Whole-home renovation in Shady Hollow, Austin TX
Shady Hollow houses were mostly built in the 1980s and 1990s, on big wooded lots off Brodie Lane. Most of them still have the original kitchen, the original baths and the original floor plan. We have remodeled two of them.
- What we do: Whole-home renovation, plus kitchen and bathroom remodels on their own
- Where: Shady Hollow and Barker Ranch at Shady Hollow, off Brodie Lane and FM 1626
- Starting price: Whole homes from $210,000; kitchens from $42,500; bathrooms from $30,000
- Finished here: Shady Hollow whole-home remodel; Gun Metal Drive kitchen and three baths

Every room from the same decade.
A Shady Hollow house usually reaches us with every room still from the year it was built: raised-panel kitchen cabinets, a tiled tub deck in the primary bath, carpet in the living areas and a hall bath with a fiberglass tub.
That is why whole-home work makes sense here. Doing the kitchen, the baths and the floors as one project means one round of demolition, one permit set, one set of trades in the right order, and finishes that match from room to room.
On Gun Metal Drive, in Barker Ranch at Shady Hollow, we remodeled the kitchen in navy shaker cabinets, two hall baths in green and wood-look tile, and the primary bath with a patterned floor and a navy vanity, and rebuilt the stair with a cable rail.
Prime Construction & Remodeling is a design-build general contractor for home remodeling in south Austin. On a whole-home project we coordinate the design, the structural checks, the foundation and window questions, the permits and every trade, so the house is planned once and built once.

Two Shady Hollow projects
Both have their own pages, with every room photographed.
- Shady Hollow — A whole-home remodel.
- Gun Metal Drive, Barker Ranch at Shady Hollow — A navy kitchen, three bathrooms and a rebuilt stair.
- Harley Avenue, Bauerle Ranch — A kitchen and bath a few minutes away.
Check who permits your street. Shady Hollow is generally outside Austin’s full-purpose city limits, in unincorporated Travis County with its own municipal utility district. That means the permitting office can differ from the City of Austin, depending on the address. We confirm the jurisdiction for your lot before drawings, so the plans go to the right office the first time.
What a Shady Hollow renovation costs
| Scope | Typical range | On site |
|---|---|---|
| Kitchen only | $42,500 – $175,000 | 5–11 weeks |
| Bathroom only | $30,000 – $130,000 | 3–8 weeks |
| Whole home, systems largely intact | $210,000 – $400,000 | Months, phased |
| Whole home, higher scope | up to $750,000 | Months, phased |
Ranges from our published Austin pricing. Whole-home ranges depend mostly on whether the plumbing, electrical and HVAC stay or get replaced.
Getting to us. Our office at 705 N Bluff Dr is about 4 miles northeast of Shady Hollow, off South Congress Avenue near William Cannon Drive. From Shady Hollow it is a short drive east on Slaughter Lane and north on South Congress.
Whole-home remodeling in Shady Hollow, answered
How much does a whole-home remodel cost in Shady Hollow?
With Prime Construction & Remodeling, $210,000 to $400,000 when the plumbing, electrical and HVAC stay largely in place, and up to $750,000 when systems are replaced and the layout changes.
How much does a kitchen remodel cost in Shady Hollow?
$42,500 to $90,000 for a same-footprint kitchen, $77,500 to $130,000 with a wall removed or plumbing moved, and up to $175,000 with full custom millwork.
Is Shady Hollow in the City of Austin?
Shady Hollow is generally outside Austin’s full-purpose city limits, in unincorporated Travis County with its own municipal utility district. The permitting office depends on the exact address, which we confirm before drawings.
Can we live in the house during a whole-home remodel?
No. With every room open and the systems off for stretches, a whole-home renovation is built with the house empty. If you are already living there, phasing room by room is usually the better answer.
How long does a whole-home renovation take?
Several months, depending on scope. Design, selections and permits come first; on-site work is scheduled so each trade comes once.
Should we remodel everything at once or room by room?
All at once is cheaper per room because demolition, permits and trade visits happen once. Room by room spreads the cost and lets you stay in the house.
What is usually behind the walls in a 1980s house?
Something turns up in roughly one project in four: old drain lines, undersized electrical, or water damage under a window or shower pan. Hold back 10 to 15 percent of the budget for it.
Do you charge for the first visit?
No. We walk the house and give you a range the same day, before anyone pays for drawings.
Thinking about every room at once?
We will walk the house, tell you what a whole-home remodel would include and cost, and what phasing would look like instead.
What clients say.
★★★★★
We hired Prime to do our bathroom and kitchen renovation. We are extremely pleased with the outcome. This was our first remodel and both my wife and I are very demanding, but Jesse was very patient and very responsive. He helped with every aspect even through warranty never shying away from any corrections or warranty issues.
Rudy Loera · Bathroom & kitchen · Google
★★★★★
Loved our remodel, they did our master bath and kitchen. They were very responsive. Actually we had a pipe break a week before we were supposed to start and they dropped everything to help me out when they didn’t have to since the remodel had not even started yet. I think that speaks volumes to the customer service that they give. I would use them again.
Brad Venghaus · Master bath & kitchen · Google
★★★★★
From start to finish on my kitchen upgrade project, Prime Construction was amazing! My project manager is so knowledgeable, had great design ideas, responded quickly and kept me informed every step of the way. The craftsmanship was superb! I highly recommend Prime Construction.
Stephanie O’Neal · Kitchen · Google




