Taylorcrest Drive

A white oak vanity, a frameless glass shower and brushed gold on every fitting, in a Western Oaks bathroom in southwest Austin.

Frameless glass shower with brushed gold fittings and a recessed niche, Taylorcrest Drive, Western Oaks, Austin, TX
Bathroom

One metal, one wood, one stone-look tile

The finish choices were kept to three, and every one repeats.

The vanity is rift-cut white oak with a slab drawer front, two side drawers and a pair of shaker doors, with matte black pulls. The top is white quartz with an undermount sink and a brushed gold widespread faucet.

The shower is walk-in behind frameless glass on brushed gold hinges, with a long gold pull. Inside, a thermostatic valve, a separate diverter and a handheld on a slide bar are all in the same brushed gold, and a niche is set into the back wall.

Large-format porcelain in a warm stone look runs up the shower and wraps the vanity wall to wainscot height. The floor is a white triangle mosaic. Towel bars, the ring and the vanity light are gold to match.

Brushed gold is on the faucet, the shower trim, the glass hardware, the towel bars and the light. Nothing else competes with it.

The investment is not listed here. A bathroom like this is priced with our bathrooms — See published bathroom costs.

Location Western Oaks
Scope Bathroom
Finish White oak and brushed gold
Investment Not published
White oak vanity with a quartz top beside the frameless glass shower, Western Oaks, Austin, TX
The photographs

The vanity, the shower and the details.

White oak vanity under a brushed gold framed mirror, Taylorcrest Drive, Austin, TX
Rift-cut white oak vanity drawers with matte black pulls, Western Oaks, Austin, TX
Brushed gold widespread faucet on a white quartz vanity top, Western Oaks, Austin, TX
Brushed gold thermostatic shower valve and handheld on a slide bar, Western Oaks, Austin, TX
White triangle mosaic floor tile meeting stone-look wall tile, Western Oaks, Austin, TX
Where this project is

Bathroom remodeling in Western Oaks

Taylorcrest Drive is in the Village at Western Oaks, in the 78749 ZIP code in southwest Austin, between Oak Hill and Circle C. Like most of southwest Austin, the houses here sit on concrete slabs, so where the drains are decides much of what a bathroom costs.

This bathroom kept its footprint. The money went into the shower, the glass and the fittings rather than into moving drains through the slab, which is the biggest single cost jump in a bathroom.

Impervious cover only matters if you add on. Much of southwest Austin drains to Barton Creek, where the Save Our Springs ordinance caps impervious cover at 15 to 25 percent of the site depending on the zone. A bathroom remodel inside the existing house is not affected. If the bath grows into an addition, it is the first number we check.

Getting here. The neighborhood is about 7 miles and 15 minutes outside rush hour from our office. From our office at 705 N Bluff Dr, take William Cannon Drive west to MoPac, then head south and west into Western Oaks. Get directions →

Remodeling in Oak Hill and Western Oaks →

The map shows the neighborhood, not the house. We never publish client addresses.

Cost and time

What a bathroom like this costs in Austin

We do not publish the price of a single client’s project. These are our published ranges for bathrooms in Austin, and the time on site for each. Selections and permits come first, usually two to four weeks.

ScopePublished rangeOn site
Full gut with the plumbing in place$30,000 – $50,0003–4 weeks
Reconfigured layout, such as a tub turned into a walk-in shower$42,500 – $80,0004–6 weeks
Luxury primary suite$67,500 – $130,0006–8 weeks

See every published bathroom cost →   The most expensive part of a bathroom remodel →

Common questions

Questions about a project like this

How much does a bathroom remodel cost in southwest Austin?

With Prime Construction & Remodeling, $30,000 to $50,000 for a full gut with the plumbing in place, $42,500 to $80,000 for a reconfigured layout, and $67,500 to $130,000 for a luxury primary suite.

What is the most expensive part of a bathroom remodel?

Usually the shower: waterproofing, tile labor, the valve and the glass. Moving a fixture on the slab is the biggest single jump.

Do I need a permit for a bathroom remodel in Austin?

Inside City of Austin limits, replacing fixtures in place needs no permit. Moving plumbing, changing circuits or changing the layout does, filed through the city’s AB+C portal.

How long does a bathroom remodel take?

Three to four weeks on site for a full gut with the plumbing in place, four to six weeks for a reconfigured layout, plus two to four weeks beforehand for selections and permits.

Can we use the house during a bathroom remodel?

Yes, as long as there is another working bathroom. We contain the work area and protect the route in and out.

Start here

Planning a bathroom in southwest Austin?

Tell us the room and we will send the closest finished project we have, with what it took.